Kedai catPony Luxury Coating
Pony L11000 (11x5x5)
Kedai cat
Pony Luxury Coating
Pony L11000 (11x5x5)
Harga tetap ditambah cukai perkhidmatan
€81,250
Tahun pembuatan
2025
Keadaan
Baharu
(berfungsi sepenuhnya)
Lokasi
Würzburg 

Data asas
- Nama mesin:
- Kedai cat
- Pengeluar:
- Pony Luxury Coating
- Model:
- Pony L11000 (11x5x5)
- Tahun pembuatan:
- 2025
- Keadaan:
- baharu
- Fungsi:
- berfungsi sepenuhnya
Harga & Lokasi
Harga tetap ditambah cukai perkhidmatan
€81,250
- Lokasi:
- Schulstr 3, 97084 Würzburg, Deutschland

Hubungi
Butiran teknikal
Dimensi dan berat
Jumlah panjang:
11,200 mm
Lebar keseluruhan:
5,100 mm
Jumlah ketinggian:
5,600 mm
Ketinggian dalaman:
4,970 mm
Panjang dalaman:
11,000 mm
Lebar dalam:
5,000 mm
Enjin dan kotak gear
Bahan api:
gas petroleum cecair (LPG)
Butiran kuasa
Voltan masuk:
380 V
Frekuensi masukan:
50 Hz
Penggunaan tenaga:
45 kWh
Jenis arus masuk:
tiga fasa
Peralatan
Pencahayaan
Dokumentasi dan pensijilan
Tempoh jaminan:
24 bulan
Bahan/produk boleh diproses
Ketebalan plat keluli (maks.):
2 mm
Maklumat lanjut
Kuasa:
45 kW (61.18 kuasa kuda)
Keperluan udara:
52,000 m³/j
Kapasiti pemanasan:
250 kW (339.91 kuasa kuda)
Ketebalan penebat:
50 mm
Kuasa nominal:
250 kW (339.91 kuasa kuda)
Suhu:
80 °C
Butiran tawaran
- ID iklan:
- A19572531
- Kemas kini:
- terakhir pada 15.01.2026
Penerangan
* Air Preparation Unit:
The air preparation unit is a recirculation system that supplies the cabin with filtered fresh air and exhausts used air during the painting process. It heats the air to 60 °C, mixes the used air with 10% fresh air via an automatic multi-damper system, and reheats the air before routing it back into the cabin. The air is heated using a burner and a heat exchanger, both made of high-quality 304 stainless steel and housed within the fresh air unit. During painting, the air is filtered twice (via front and ceiling filters) before it enters the cabin. The contaminated air is also filtered twice (through inlet and outlet filters) before it exits via the exhaust unit. Air preparation units are insulated like the side walls to minimize heat loss and are protected against potential vibration and noise thanks to rubber seals on the covers. The exhaust air is regulated by a damper in the outlet duct, which helps control the internal pressure of the cabin.
* PRINCIPLES OF CABIN OPERATION:
The processes in the cabin are controlled via a control panel that manages the following steps:
* PAINTING PROCESS:
During painting, 100% fresh air is drawn in from outside and passed through front filters before entering the distribution chamber at ambient temperature. The air is then expelled by the extraction unit. Floor filters (paint stops) capture paint particles, and the air passes through the final exhaust filters before being discharged.
* FLASH-OFF PROCESS:
After painting, the cabin operates for approximately 15 more minutes to purge residual solvents and thinners. During this phase, fresh air from outside continues to circulate in the cabin.
Cedpfx Aswzl Hxjk Dohc
* DRYING PROCESS:
In this phase, 80% of the air passing through the cabin is heated to 60 °C and supplied to the cabin via a distributor. As 20% of the solvent is released during drying, these solvents are expelled with the exhaust air. Industrial coatings are typically dried at 60 °C, but the cabin temperature can be adjusted via the control panel as required.
* COOLING PROCESS:
After the 30-minute drying process, the coil is deactivated via the control panel, the pneumatic damper closes, and the extraction system restarts. During the 5-minute cooling phase, fresh air from outside circulates in the cabin, after which the system stops automatically.
ELECTRICAL AND ELECTRONIC EQUIPMENT:
These control panels manage the functions and operation of all machinery and devices inside the cabin. The control panel is constructed from durable galvanized sheet metal and steel profiles and is fully enclosed to protect against dust and moisture.
Electrical devices and control panels:
• The control panel contains essential components such as circuit breakers, fuses, indicator lamps, thermal relays, contactors, and connectors.
• Heat-resistant cables are used for command and control lines between the panel and motors or other electrical devices.
• Electrical wiring is designed to allow for cabin relocation if necessary.
• Operating devices use 380 V 50 Hz, while control devices use 220 V.
Iklan ini diterjemahkan secara automatik. Mungkin terdapat kesilapan terjemahan.
The air preparation unit is a recirculation system that supplies the cabin with filtered fresh air and exhausts used air during the painting process. It heats the air to 60 °C, mixes the used air with 10% fresh air via an automatic multi-damper system, and reheats the air before routing it back into the cabin. The air is heated using a burner and a heat exchanger, both made of high-quality 304 stainless steel and housed within the fresh air unit. During painting, the air is filtered twice (via front and ceiling filters) before it enters the cabin. The contaminated air is also filtered twice (through inlet and outlet filters) before it exits via the exhaust unit. Air preparation units are insulated like the side walls to minimize heat loss and are protected against potential vibration and noise thanks to rubber seals on the covers. The exhaust air is regulated by a damper in the outlet duct, which helps control the internal pressure of the cabin.
* PRINCIPLES OF CABIN OPERATION:
The processes in the cabin are controlled via a control panel that manages the following steps:
* PAINTING PROCESS:
During painting, 100% fresh air is drawn in from outside and passed through front filters before entering the distribution chamber at ambient temperature. The air is then expelled by the extraction unit. Floor filters (paint stops) capture paint particles, and the air passes through the final exhaust filters before being discharged.
* FLASH-OFF PROCESS:
After painting, the cabin operates for approximately 15 more minutes to purge residual solvents and thinners. During this phase, fresh air from outside continues to circulate in the cabin.
Cedpfx Aswzl Hxjk Dohc
* DRYING PROCESS:
In this phase, 80% of the air passing through the cabin is heated to 60 °C and supplied to the cabin via a distributor. As 20% of the solvent is released during drying, these solvents are expelled with the exhaust air. Industrial coatings are typically dried at 60 °C, but the cabin temperature can be adjusted via the control panel as required.
* COOLING PROCESS:
After the 30-minute drying process, the coil is deactivated via the control panel, the pneumatic damper closes, and the extraction system restarts. During the 5-minute cooling phase, fresh air from outside circulates in the cabin, after which the system stops automatically.
ELECTRICAL AND ELECTRONIC EQUIPMENT:
These control panels manage the functions and operation of all machinery and devices inside the cabin. The control panel is constructed from durable galvanized sheet metal and steel profiles and is fully enclosed to protect against dust and moisture.
Electrical devices and control panels:
• The control panel contains essential components such as circuit breakers, fuses, indicator lamps, thermal relays, contactors, and connectors.
• Heat-resistant cables are used for command and control lines between the panel and motors or other electrical devices.
• Electrical wiring is designed to allow for cabin relocation if necessary.
• Operating devices use 380 V 50 Hz, while control devices use 220 V.
Iklan ini diterjemahkan secara automatik. Mungkin terdapat kesilapan terjemahan.
Dokumen
Pembekal
Nota: Daftar secara percuma atau log masuk, untuk mengakses semua maklumat.
Didaftarkan sejak: 2025
8 Iklan dalam talian
Hantar permintaan
Telefon & Faks
+49 931 4... iklan
Iklan-iklan ini juga mungkin menarik minat anda.
Berjaya
Mesej anda telah dihantar.
Iklan kecil
Petershagen
9,856 km
Treler separuh rendah
Gabelstapler/Arbeitsbühnentransporter Klapprampe
Gabelstapler/Arbeitsbühnentransporter Klapprampe
Berjaya
Mesej anda telah dihantar.
Iklan kecil
Büyükkayacık OSB
7,926 km
Kereta membawa semitrailer
LiderTruck Carrier 1
LiderTruck Carrier 1
Berjaya
Mesej anda telah dihantar.
Iklan kecil
Finland
8,887 km
Unit sandblasting
Gietart
Gietart
Berjaya
Mesej anda telah dihantar.
Iklan kecil
Würzburg
9,806 km
Kedai cat
Pony Luxury Coating M&KPony 7000
Pony Luxury Coating M&KPony 7000
Berjaya
Mesej anda telah dihantar.
Iklan kecil
Deskle
9,554 km
Unit sandblasting
COGEIMPG 10x15
COGEIMPG 10x15
Berjaya
Mesej anda telah dihantar.
Iklan kecil
Metzingen
9,865 km
Mesin penggilingan - sejagat
GELDMACHERUWF 405
GELDMACHERUWF 405
Berjaya
Mesej anda telah dihantar.
Iklan kecil
Wiefelstede
9,900 km
Plat pengapit dengan slot T
unbekannt4930/1465/H850 mm
unbekannt4930/1465/H850 mm
Berjaya
Mesej anda telah dihantar.
Iklan kecil
Bitburg
10,048 km
Meja sembur/meja mengecat
RehnenLacky
RehnenLacky
Berjaya
Mesej anda telah dihantar.
Iklan kecil
Soerendonk
10,096 km
Mesin sandblasting CM Monorail
CM Surface treatment Spa.M1500 Monorail
CM Surface treatment Spa.M1500 Monorail
Berjaya
Mesej anda telah dihantar.
Iklan kecil
Luckenwalde
9,569 km
UNIT PEMULIHAN KELELAS VACUUM
PROTONP-V-LINE
PROTONP-V-LINE
Iklan anda telah berjaya dipadamkan
Berlaku ralat