Kedai catPony Luxury Coating
Pony L11000 (11x5x5)
Kedai cat
Pony Luxury Coating
Pony L11000 (11x5x5)
harga tetap ditambah cukai perkhidmatan
€81,250
Tahun pembuatan
2025
Keadaan
Baharu
(berfungsi sepenuhnya)
Lokasi
Würzburg 

Data mesin
- Nama mesin:
- Kedai cat
- Pengeluar:
- Pony Luxury Coating
- Model:
- Pony L11000 (11x5x5)
- Tahun pembuatan:
- 2025
- Keadaan:
- baharu
- Fungsi:
- berfungsi sepenuhnya
Harga & Lokasi
harga tetap ditambah cukai perkhidmatan
€81,250
- Lokasi:
- Schulstr 3, 97084 Würzburg, Deutschland

Hubungi
Butiran teknikal
- Jumlah ketinggian:
- 5,600 mm
- Jumlah panjang:
- 11,200 mm
- Lebar keseluruhan:
- 5,100 mm
- Jenis arus masuk:
- tiga fasa
- Tempoh jaminan:
- 24 bulan
- Ketinggian dalaman:
- 4,970 mm
- Panjang dalaman:
- 11,000 mm
- Suhu:
- 80 °C
- Lebar dalam:
- 5,000 mm
- Keperluan udara:
- 52,000 m³/j
- Voltan masuk:
- 380 V
- Kapasiti pemanasan:
- 250 kW (339.91 kuasa kuda)
- Kuasa:
- 45 kW (61.18 kuasa kuda)
- Bahan api:
- gas petroleum cecair (LPG)
- Frekuensi masukan:
- 50 Hz
- Penggunaan tenaga:
- 45 kWh
- Ketebalan penebat:
- 50 mm
- Kuasa nominal:
- 250 kW (339.91 kuasa kuda)
- Ketebalan plat keluli (maks.):
- 2 mm
- Peralatan:
- pencahayaan
Butiran tawaran
- ID iklan:
- A19572531
- Kemas kini:
- terakhir pada 15.01.2026
Penerangan
* Air Preparation Unit:
The air preparation unit is a recirculation system that supplies the cabin with filtered fresh air and exhausts used air during the painting process. It heats the air to 60 °C, mixes the used air with 10% fresh air via an automatic multi-damper system, and reheats the air before routing it back into the cabin. The air is heated using a burner and a heat exchanger, both made of high-quality 304 stainless steel and housed within the fresh air unit. During painting, the air is filtered twice (via front and ceiling filters) before it enters the cabin. The contaminated air is also filtered twice (through inlet and outlet filters) before it exits via the exhaust unit. Air preparation units are insulated like the side walls to minimize heat loss and are protected against potential vibration and noise thanks to rubber seals on the covers. The exhaust air is regulated by a damper in the outlet duct, which helps control the internal pressure of the cabin.
* PRINCIPLES OF CABIN OPERATION:
The processes in the cabin are controlled via a control panel that manages the following steps:
* PAINTING PROCESS:
During painting, 100% fresh air is drawn in from outside and passed through front filters before entering the distribution chamber at ambient temperature. The air is then expelled by the extraction unit. Floor filters (paint stops) capture paint particles, and the air passes through the final exhaust filters before being discharged.
Gkodpfxjwzl Hxj Agtea
* FLASH-OFF PROCESS:
After painting, the cabin operates for approximately 15 more minutes to purge residual solvents and thinners. During this phase, fresh air from outside continues to circulate in the cabin.
* DRYING PROCESS:
In this phase, 80% of the air passing through the cabin is heated to 60 °C and supplied to the cabin via a distributor. As 20% of the solvent is released during drying, these solvents are expelled with the exhaust air. Industrial coatings are typically dried at 60 °C, but the cabin temperature can be adjusted via the control panel as required.
* COOLING PROCESS:
After the 30-minute drying process, the coil is deactivated via the control panel, the pneumatic damper closes, and the extraction system restarts. During the 5-minute cooling phase, fresh air from outside circulates in the cabin, after which the system stops automatically.
ELECTRICAL AND ELECTRONIC EQUIPMENT:
These control panels manage the functions and operation of all machinery and devices inside the cabin. The control panel is constructed from durable galvanized sheet metal and steel profiles and is fully enclosed to protect against dust and moisture.
Electrical devices and control panels:
• The control panel contains essential components such as circuit breakers, fuses, indicator lamps, thermal relays, contactors, and connectors.
• Heat-resistant cables are used for command and control lines between the panel and motors or other electrical devices.
• Electrical wiring is designed to allow for cabin relocation if necessary.
• Operating devices use 380 V 50 Hz, while control devices use 220 V.
Iklan ini diterjemahkan secara automatik. Mungkin terdapat kesilapan terjemahan.
The air preparation unit is a recirculation system that supplies the cabin with filtered fresh air and exhausts used air during the painting process. It heats the air to 60 °C, mixes the used air with 10% fresh air via an automatic multi-damper system, and reheats the air before routing it back into the cabin. The air is heated using a burner and a heat exchanger, both made of high-quality 304 stainless steel and housed within the fresh air unit. During painting, the air is filtered twice (via front and ceiling filters) before it enters the cabin. The contaminated air is also filtered twice (through inlet and outlet filters) before it exits via the exhaust unit. Air preparation units are insulated like the side walls to minimize heat loss and are protected against potential vibration and noise thanks to rubber seals on the covers. The exhaust air is regulated by a damper in the outlet duct, which helps control the internal pressure of the cabin.
* PRINCIPLES OF CABIN OPERATION:
The processes in the cabin are controlled via a control panel that manages the following steps:
* PAINTING PROCESS:
During painting, 100% fresh air is drawn in from outside and passed through front filters before entering the distribution chamber at ambient temperature. The air is then expelled by the extraction unit. Floor filters (paint stops) capture paint particles, and the air passes through the final exhaust filters before being discharged.
Gkodpfxjwzl Hxj Agtea
* FLASH-OFF PROCESS:
After painting, the cabin operates for approximately 15 more minutes to purge residual solvents and thinners. During this phase, fresh air from outside continues to circulate in the cabin.
* DRYING PROCESS:
In this phase, 80% of the air passing through the cabin is heated to 60 °C and supplied to the cabin via a distributor. As 20% of the solvent is released during drying, these solvents are expelled with the exhaust air. Industrial coatings are typically dried at 60 °C, but the cabin temperature can be adjusted via the control panel as required.
* COOLING PROCESS:
After the 30-minute drying process, the coil is deactivated via the control panel, the pneumatic damper closes, and the extraction system restarts. During the 5-minute cooling phase, fresh air from outside circulates in the cabin, after which the system stops automatically.
ELECTRICAL AND ELECTRONIC EQUIPMENT:
These control panels manage the functions and operation of all machinery and devices inside the cabin. The control panel is constructed from durable galvanized sheet metal and steel profiles and is fully enclosed to protect against dust and moisture.
Electrical devices and control panels:
• The control panel contains essential components such as circuit breakers, fuses, indicator lamps, thermal relays, contactors, and connectors.
• Heat-resistant cables are used for command and control lines between the panel and motors or other electrical devices.
• Electrical wiring is designed to allow for cabin relocation if necessary.
• Operating devices use 380 V 50 Hz, while control devices use 220 V.
Iklan ini diterjemahkan secara automatik. Mungkin terdapat kesilapan terjemahan.
Dokumen
Pembekal
Nota: Daftar secara percuma atau log masuk, untuk mengakses semua maklumat.
Didaftarkan sejak: 2025
8 Iklan dalam talian
Hantar permintaan
Telefon & Faks
+49 931 4... iklan
Iklan-iklan ini juga mungkin menarik minat anda.
Iklan kecil
Enschede
9,998 km
Mesin lentur bulat
OSTAS4R OHS 2070 x 220
OSTAS4R OHS 2070 x 220
Iklan kecil
Parma
9,818 km
Jentera pembinaan pemuat rendah
CEYLAN carrellone rampe idrauliche nuovo
CEYLAN carrellone rampe idrauliche nuovo
Iklan kecil
Büyükkayacık OSB
7,927 km
Pemuat rendah
GVN Trailer3 Axle Tramex Platform Lowbed
GVN Trailer3 Axle Tramex Platform Lowbed
Iklan kecil
Petershagen
9,856 km
Treler separuh rendah
Gabelstapler/Arbeitsbühnentransporter Klapprampe
Gabelstapler/Arbeitsbühnentransporter Klapprampe
Iklan kecil
Finland
8,887 km
Unit sandblasting
Gietart
Gietart
Iklan kecil
Avižieniai
8,789 km
Sistem kemasan cat
Wagner
Wagner
Iklan kecil
Würzburg
9,806 km
Kedai cat
Pony Luxury Coating M&KPony 7000
Pony Luxury Coating M&KPony 7000
Iklan kecil
Metzingen
9,865 km
Mesin penggilingan - sejagat
GELDMACHERUWF 405
GELDMACHERUWF 405
Iklan kecil
Büyükkayacık OSB
7,926 km
Kereta membawa semitrailer
LiderTruck Carrier 1
LiderTruck Carrier 1
Iklan kecil
Bitburg
10,048 km
Meja sembur/meja mengecat
RehnenLacky
RehnenLacky
Iklan anda telah berjaya dipadamkan
Berlaku ralat
























































































































