Kedai catPony Luxury Coating M&K
Pony 7000
Kedai cat
Pony Luxury Coating M&K
Pony 7000
Harga tetap ditambah cukai perkhidmatan
€42,450
Tahun pembuatan
2025
Keadaan
Baharu
Lokasi
Würzburg 

Data asas
- Nama mesin:
- Kedai cat
- Pengeluar:
- Pony Luxury Coating M&K
- Model:
- Pony 7000
- Tahun pembuatan:
- 2025
- Keadaan:
- baharu
Harga & Lokasi
Harga tetap ditambah cukai perkhidmatan
€42,450
- Lokasi:
- Schulstr 3, 97084 Würzburg, Deutschland

Hubungi
Butiran teknikal
Dimensi dan berat
Jumlah panjang:
7,000 mm
Lebar keseluruhan:
3,000 mm
Jumlah ketinggian:
4,000 mm
Enjin dan kotak gear
Bahan api:
gas petroleum cecair (LPG)
Butiran kuasa
Voltan masuk:
380 V
Penggunaan tenaga:
40 kWh
Peralatan
Pencahayaan
Dokumentasi dan pensijilan
Tempoh jaminan:
24 bulan
Maklumat lanjut
Kuasa:
40 kW (54.38 kuasa kuda)
Keperluan udara:
36,000 m³/j
Kapasiti pemanasan:
345 kW (469.07 kuasa kuda)
Bahan penebat:
Mineralwolle
Ketebalan penebat:
50 mm
Kuasa nominal:
345 kW (469.07 kuasa kuda)
Suhu:
80 °C
Butiran tawaran
- ID iklan:
- A19572801
- Nombor rujukan:
- L7000
- Kemas kini:
- terakhir pada 15.01.2026
Penerangan
MAIN STANDARD
Our paint booths are designed to meet all necessary requirements for paint application, including air filtration, extraction, lighting, and a controlled environment. Booth processes are managed via a PLC system, ensuring that desired values are maintained consistently.
OPERATING PRINCIPLES OF THE BOOTH
The booth’s processes are managed through a control panel, which oversees the following steps:
PAINTING PROCESS
During painting, 100% fresh air is drawn in from outside and passed through front filters before entering the distribution chamber at ambient temperature. The air is then expelled through the extraction unit. Floor filters (paint stop filters) collect paint particles, and the air passes through final exhaust filters before being discharged.
FLASH-OFF PROCESS
After painting, the booth continues operating for approximately 15 minutes to purge residual solvents and thinners. During this phase, fresh air circulates from outside into the booth.
DRYING PROCESS
In this stage, 80% of the air passing through the booth is heated to 60°C and introduced via a distribution system. Since 20% of the solvent is released during drying, it is expelled with the exhaust air. Industrial coatings are typically dried at 60°C, but the booth temperature can be adjusted as needed via the control panel.
COOLING PROCESS
After the 30-minute drying cycle, the coil is deactivated via the control panel, the pneumatic damper closes, and the extraction system restarts. During the subsequent 5-minute cooling phase, fresh air from outside circulates through the booth, after which the system shuts down automatically.
Prjdpfx Akjwzmcbj Aec
ELECTRICAL AND ELECTRONIC EQUIPMENT
These control panels govern the functions and operation of machines and devices housed within the booth. The panel is made of durable galvanized sheet and steel profiles and is fully enclosed to protect against dust and moisture.
Electrical Equipment and Control Panel:
• The control panel contains essential components such as circuit breakers, fuses, indicator lamps, thermal relays, contactors, and connectors.
• Heat-resistant cables are used for command and control connections between the control panel and motors or other electrical devices.
• Electrical wiring is designed to accommodate booth relocation if needed.
• Operating equipment uses 380 V 50 Hz, while control devices operate at 220 V.
• The booth’s operation time can be monitored on the electronic control panel, enabling straightforward maintenance scheduling.
• Temperature and time settings for booth ventilation (solvent flash-off), intermediate drying, and final drying can be easily adjusted to required values on the digital display of the electronic control panel.
• Users can monitor and adjust the drying time using the heating thermostat and time relay.
Iklan ini diterjemahkan secara automatik. Mungkin terdapat kesilapan terjemahan.
Our paint booths are designed to meet all necessary requirements for paint application, including air filtration, extraction, lighting, and a controlled environment. Booth processes are managed via a PLC system, ensuring that desired values are maintained consistently.
OPERATING PRINCIPLES OF THE BOOTH
The booth’s processes are managed through a control panel, which oversees the following steps:
PAINTING PROCESS
During painting, 100% fresh air is drawn in from outside and passed through front filters before entering the distribution chamber at ambient temperature. The air is then expelled through the extraction unit. Floor filters (paint stop filters) collect paint particles, and the air passes through final exhaust filters before being discharged.
FLASH-OFF PROCESS
After painting, the booth continues operating for approximately 15 minutes to purge residual solvents and thinners. During this phase, fresh air circulates from outside into the booth.
DRYING PROCESS
In this stage, 80% of the air passing through the booth is heated to 60°C and introduced via a distribution system. Since 20% of the solvent is released during drying, it is expelled with the exhaust air. Industrial coatings are typically dried at 60°C, but the booth temperature can be adjusted as needed via the control panel.
COOLING PROCESS
After the 30-minute drying cycle, the coil is deactivated via the control panel, the pneumatic damper closes, and the extraction system restarts. During the subsequent 5-minute cooling phase, fresh air from outside circulates through the booth, after which the system shuts down automatically.
Prjdpfx Akjwzmcbj Aec
ELECTRICAL AND ELECTRONIC EQUIPMENT
These control panels govern the functions and operation of machines and devices housed within the booth. The panel is made of durable galvanized sheet and steel profiles and is fully enclosed to protect against dust and moisture.
Electrical Equipment and Control Panel:
• The control panel contains essential components such as circuit breakers, fuses, indicator lamps, thermal relays, contactors, and connectors.
• Heat-resistant cables are used for command and control connections between the control panel and motors or other electrical devices.
• Electrical wiring is designed to accommodate booth relocation if needed.
• Operating equipment uses 380 V 50 Hz, while control devices operate at 220 V.
• The booth’s operation time can be monitored on the electronic control panel, enabling straightforward maintenance scheduling.
• Temperature and time settings for booth ventilation (solvent flash-off), intermediate drying, and final drying can be easily adjusted to required values on the digital display of the electronic control panel.
• Users can monitor and adjust the drying time using the heating thermostat and time relay.
Iklan ini diterjemahkan secara automatik. Mungkin terdapat kesilapan terjemahan.
Dokumen
Pembekal
Nota: Daftar secara percuma atau log masuk, untuk mengakses semua maklumat.
Didaftarkan sejak: 2025
6 Iklan dalam talian
Hantar permintaan
Telefon & Faks
+49 931 4... iklan
Iklan-iklan ini juga mungkin menarik minat anda.
Berjaya
Mesej anda telah dihantar.
Iklan kecil
Würzburg
9,806 km
Kedai cat
Pony Luxury Coating M&KPony 7000
Pony Luxury Coating M&KPony 7000
Berjaya
Mesej anda telah dihantar.
Iklan kecil
España
11,030 km
Tiupan filem ko-ekstrusi 7 lapisan
Macchi7 capas
Macchi7 capas
Berjaya
Mesej anda telah dihantar.
Iklan kecil
Avižieniai
8,790 km
Mesin cetak fleksografi
ETI Converting EquipmentCoater Cohesio ST 520, Linerless option
ETI Converting EquipmentCoater Cohesio ST 520, Linerless option
Berjaya
Mesej anda telah dihantar.
Iklan kecil
Möttingen
9,768 km
Bekas letupan untuk semua media letupan
SAPI GmbH SandstrahlanlageMobiler Sandstrahlcontainer 20 Fuß HC
SAPI GmbH SandstrahlanlageMobiler Sandstrahlcontainer 20 Fuß HC
Berjaya
Mesej anda telah dihantar.
Iklan kecil
Lauda-Königshofen
9,825 km
Akhbar surat
HohnerBoston Tiegel M
HohnerBoston Tiegel M
Berjaya
Mesej anda telah dihantar.
Iklan kecil
Bienne
10,029 km
Mesin pelarik bar automatik
TORNOSDeco 13a
TORNOSDeco 13a
Berjaya
Mesej anda telah dihantar.
Iklan kecil
Amurrio
10,903 km
Mesin pengisar permukaan
GERRS 15/60
GERRS 15/60
Berjaya
Mesej anda telah dihantar.
Iklan kecil
Dresden
9,538 km
Akhbar surat
POLYGRAPHOM II
POLYGRAPHOM II
Berjaya
Mesej anda telah dihantar.
Iklan kecil
Jerman
9,760 km
Pelarik gelendong berganda CNC
GildemeisterTwin 32
GildemeisterTwin 32
Berjaya
Mesej anda telah dihantar.
Iklan kecil
Wöllstadt
9,886 km
Mesin pembentuk, pengisi dan penyegel beg
Impuls PackagingFlowpack Multitalent 304 BF 200/80/600 Q
Impuls PackagingFlowpack Multitalent 304 BF 200/80/600 Q
Iklan anda telah berjaya dipadamkan
Berlaku ralat















































































































