BILIK Bersih ISO 8
BILIK Bersih ISO 8
EXW VB ditambah cukai perkhidmatan
€50,000
Tahun pembuatan
2020
Keadaan
Terpakai
(berfungsi sepenuhnya)
Lokasi
Łódź 

Data asas
- Nama mesin:
- BILIK Bersih ISO 8
- Tahun pembuatan:
- 2020
- Keadaan:
- sangat baik (terpakai)
- Fungsi:
- berfungsi sepenuhnya
Harga & Lokasi
EXW VB ditambah cukai perkhidmatan
€50,000
- Lokasi:
- Łódź, Poland

Hubungi
Butiran tawaran
- ID iklan:
- A14477200
- Kemas kini:
- terakhir pada 02.01.2024
Penerangan
CLEANROOM - ISO 8
| Cleanroom requirements ISO Class 8 | ISO Cleanroom Class 8 | Cleanroom classification.
In order to achieve an ISO 8 air purity class in a Cleanroom, several levels of air filtration are usually used (e.g. G4 pre-filter, F9 filter, H13 final filter). Air movement in the room is non-unidirectional (there is a mixing of "clean" air supplied to the room with "dirty" air present in the room). Air vents in the ISO 8 room are placed on the walls. The required number of air exchanges per hour will depend on the nature of the activities conducted in the room and the number of personnel present, but the goal could be to provide 10-40 air exchanges/hr. In ISO Class 8, personnel are often present continuously. Employees may be dressed in standard work attire and visitors in a disposable apron. It is recommended to maintain a minimum overpressure of the room relative to the adjacent zone of 5-10 Pa.
Requirements for equipment and materials intended for Clean Room with ISO air cleanliness class 8 (maximum average amount of particles released when: number of samples taken = 100; measurement performed in accordance with ISO 14644-14 in a cleanliness class at least one better than the purpose of the device; number of particles/m3) Detailed description in photos.
Technical drawings attached to photos.
Description of ventilation
The purpose of the ventilation installation performed was to achieve the following air parameters in the Clean Room. The installation was made with the GBD PHARMA 2000 system, meeting all the requirements for 'clean rooms' in the highest classes of air purity.
Itedjq H H Ruepfx Adljp
Parameters for the installation: a. Air purity - ISO 8. b. Temperature 19-23 st C
c. Humidity max 38%.
a. To ensure the required purity of the supplied air, an air handling unit manufactured by DOSPEL with a maximum capacity of V= 3500 m3/h [up to 15 air changes per hour] was used. The air handling unit is equipped with pocket filters : pre-filters FK EU5/EC2 and fine filters FK-EU9/EC2. In addition, HEPA 11 filters made by EUFILTER were used in diffusers located in the ceiling. Data sheets in point H6.
As a result , with a measured flow rate of 3264 m3/h, an ISO 7 [class "C"] cleanliness class of the room was obtained in the resting state, and thus an ISO 8 [class "D" ] cleanliness class for the working state.
b. The temperature range of 19-23 deg C is for the enlarged cooler and chiller to be freely maintained with 25% fresh air.
c. In order to achieve in summer conditions with high temperatures of 30 deg C and humidity of 80%, a freon chiller of 31.4 kW and a chiller of 33.5 kW of cooling power were used. The chiller is made by FUJITSU supplied by Klimatherm Gdansk.
The room is automatically regulated overpressure in relation to the external pressure - the pressure difference at the door : 15 Pa
The automation of ventilation allows for "economical" mode , in which the installation works in a closed circuit and an overpressure of 15 Pa is maintained.
Technical data attached to the photos.
Iklan ini diterjemahkan secara automatik. Mungkin terdapat kesilapan terjemahan.
| Cleanroom requirements ISO Class 8 | ISO Cleanroom Class 8 | Cleanroom classification.
In order to achieve an ISO 8 air purity class in a Cleanroom, several levels of air filtration are usually used (e.g. G4 pre-filter, F9 filter, H13 final filter). Air movement in the room is non-unidirectional (there is a mixing of "clean" air supplied to the room with "dirty" air present in the room). Air vents in the ISO 8 room are placed on the walls. The required number of air exchanges per hour will depend on the nature of the activities conducted in the room and the number of personnel present, but the goal could be to provide 10-40 air exchanges/hr. In ISO Class 8, personnel are often present continuously. Employees may be dressed in standard work attire and visitors in a disposable apron. It is recommended to maintain a minimum overpressure of the room relative to the adjacent zone of 5-10 Pa.
Requirements for equipment and materials intended for Clean Room with ISO air cleanliness class 8 (maximum average amount of particles released when: number of samples taken = 100; measurement performed in accordance with ISO 14644-14 in a cleanliness class at least one better than the purpose of the device; number of particles/m3) Detailed description in photos.
Technical drawings attached to photos.
Description of ventilation
The purpose of the ventilation installation performed was to achieve the following air parameters in the Clean Room. The installation was made with the GBD PHARMA 2000 system, meeting all the requirements for 'clean rooms' in the highest classes of air purity.
Itedjq H H Ruepfx Adljp
Parameters for the installation: a. Air purity - ISO 8. b. Temperature 19-23 st C
c. Humidity max 38%.
a. To ensure the required purity of the supplied air, an air handling unit manufactured by DOSPEL with a maximum capacity of V= 3500 m3/h [up to 15 air changes per hour] was used. The air handling unit is equipped with pocket filters : pre-filters FK EU5/EC2 and fine filters FK-EU9/EC2. In addition, HEPA 11 filters made by EUFILTER were used in diffusers located in the ceiling. Data sheets in point H6.
As a result , with a measured flow rate of 3264 m3/h, an ISO 7 [class "C"] cleanliness class of the room was obtained in the resting state, and thus an ISO 8 [class "D" ] cleanliness class for the working state.
b. The temperature range of 19-23 deg C is for the enlarged cooler and chiller to be freely maintained with 25% fresh air.
c. In order to achieve in summer conditions with high temperatures of 30 deg C and humidity of 80%, a freon chiller of 31.4 kW and a chiller of 33.5 kW of cooling power were used. The chiller is made by FUJITSU supplied by Klimatherm Gdansk.
The room is automatically regulated overpressure in relation to the external pressure - the pressure difference at the door : 15 Pa
The automation of ventilation allows for "economical" mode , in which the installation works in a closed circuit and an overpressure of 15 Pa is maintained.
Technical data attached to the photos.
Iklan ini diterjemahkan secara automatik. Mungkin terdapat kesilapan terjemahan.
Pembekal
Nota: Daftar secara percuma atau log masuk, untuk mengakses semua maklumat.
Didaftarkan sejak: 2023
1 Iklan dalam talian
Hantar permintaan
Telefon & Faks
+48 728 4... iklan
Iklan-iklan ini juga mungkin menarik minat anda.
Berjaya
Mesej anda telah dihantar.
Lelong
Tamat dalam
d
h
min
s
Lelong telah tamat
Jerman
9,760 km
Mesin pemotong kawat edm
GF Agie CharmillesROBOFILL 240 SLP
GF Agie CharmillesROBOFILL 240 SLP
Berjaya
Mesej anda telah dihantar.
Iklan kecil
St. Gallen
9,866 km
Sistem pembersihan ultrasonik
Ultraschallreinigungsanlage BR-80BR-80-M
Ultraschallreinigungsanlage BR-80BR-80-M
Berjaya
Mesej anda telah dihantar.
Lelong
Tamat dalam
d
h
min
s
Lelong telah tamat
Baden-Württemberg
9,833 km
Pisau pemotong keluli sekatan
Peddinghaus210/13
Peddinghaus210/13
Berjaya
Mesej anda telah dihantar.
Lelong
Tamat dalam
d
h
min
s
Lelong telah tamat
Baden-Württemberg
9,833 km
Mesin pengisar
MikronWF 31D
MikronWF 31D
Berjaya
Mesej anda telah dihantar.
Iklan kecil
Güglingen
9,882 km
Peranti pengudaraan, pengendali udara, penyejukan dewan
IKGIKL150
IKGIKL150
Berjaya
Mesej anda telah dihantar.
Lelong
Tamat dalam
d
h
min
s
Lelong telah tamat
Baden-Württemberg
9,833 km
Mesin penggerek presisi
Hauser5
Hauser5
Berjaya
Mesej anda telah dihantar.
Lelong
Tamat dalam
d
h
min
s
Lelong telah tamat
Baden-Württemberg
9,833 km
Mesin pengacu automatik
SchaalSEP 63
SchaalSEP 63
Berjaya
Mesej anda telah dihantar.
Iklan kecil
Skarżysko-Kamienna
9,032 km
Ketuhar rak
Romer PolandSL
Romer PolandSL
Berjaya
Mesej anda telah dihantar.
Lelong
Tamat dalam
d
h
min
s
Lelong telah tamat
Baden-Württemberg
9,833 km
Tekan hidraulik
Hans SchoenSH/LF100
Hans SchoenSH/LF100
Berjaya
Mesej anda telah dihantar.
Lelong
Tamat dalam
d
h
min
s
Lelong telah tamat
Baden-Württemberg
9,833 km
Pos meja putar (Rundteiltische)
Rundteiltische
Rundteiltische
Berjaya
Mesej anda telah dihantar.
Iklan kecil
Dortmund
9,965 km
Relau preheating gas-fired.
VEI-EngineeringVEI_KO_V_GB_400-350
VEI-EngineeringVEI_KO_V_GB_400-350
Berjaya
Mesej anda telah dihantar.
Lelong
Tamat dalam
d
h
min
s
Lelong telah tamat
Baden-Württemberg
9,833 km
Pengisar tali sawat panjang
KuhlmeyerEBS21
KuhlmeyerEBS21
Berjaya
Mesej anda telah dihantar.
Lelong
Tamat dalam
d
h
min
s
Lelong telah tamat
Baden-Württemberg
9,833 km
Mesin pelurus plat
Blechtrichtmaschine
Blechtrichtmaschine
Berjaya
Mesej anda telah dihantar.
Iklan kecil
Hradec Králové
9,386 km
Pemotong sayur
Urschel1700
Urschel1700
Berjaya
Mesej anda telah dihantar.
Lelong
Tamat dalam
d
h
min
s
Lelong telah tamat
Baden-Württemberg
9,833 km
Keratan bijih timah
Mubea
Mubea
Iklan anda telah berjaya dipadamkan
Berlaku ralat


























































































































































