Tumbuhan penyembur tingkapFINITURE
Fensterlackieranlage
Tumbuhan penyembur tingkap
FINITURE
Fensterlackieranlage
harga tetap ditambah cukai perkhidmatan
€900
Tahun pembuatan
2008
Keadaan
Terpakai
Lokasi
Pöllau bei Hartberg 

Gambar menunjukkan
Tunjukkan peta
Data mesin
- Nama mesin:
- Tumbuhan penyembur tingkap
- Pengeluar:
- FINITURE
- Model:
- Fensterlackieranlage
- Nombor mesin:
- IMBDS63-52-10-45-2/SP/DC/SB
- Tahun pembuatan:
- 2008
- Keadaan:
- terpakai
- Fungsi:
- berfungsi sepenuhnya
Harga & Lokasi
harga tetap ditambah cukai perkhidmatan
€900
- Lokasi:
- Pöllau bei Hartberg, Austria

Hubungi
Butiran teknikal
- Berat kepingan kerja (maks.):
- 120 kg
- Ketinggian kerja:
- 2,850 mm
- Kuasa:
- 35 kW (47.59 kuasa kuda)
- Keperluan udara:
- 24,000 m³/j
- Sambungan udara termampat:
- 6 palang
Butiran tawaran
- ID iklan:
- A20820642
- Nombor rujukan:
- 268/7
- Kemas kini:
- terakhir pada 23.12.2025
Penerangan
The existing window coating line was in full operation until December 19, 2025. The system is currently still connected to the electrical supply network but will be replaced by a new robotic coating system over the turn of the year.
The objective is to find a suitable subsequent user who will professionally dismantle and remove the complete system on their own responsibility at the beginning of the coming year.
System Concept Description
Loading and unloading of traverses with window frames and sashes takes place via a lifting/lowering station, which allows for ergonomic and process-safe feeding of the system.
Impregnation and priming of the workpieces is carried out in a vertical flooding booth. The coating application is performed using the flooding process via vertically arranged coating nozzles. This is followed by a drip-off and drying zone, where the traverses are guided in an inclined position.
The first drying tunnel has a buffer capacity of approx. 40 traverses. Drying is achieved by means of warm air generated from a hot water system with a supply temperature of approx. 85°C.
A switching unit enables workpieces to be routed either to a second impregnation/priming stage or directly to the subsequent coating section, as required.
The coating section consists of a lifting stand with integrated electrostatic application (E-Statik). Coating is performed on one side only, supplemented by an automated turning unit, allowing workpieces to be returned to the spray system for a repeat coating pass.
The second drying tunnel enables buffering of approx. 50 traverses. Here as well, drying is by warm air supplied by a hot water system at approx. 85°C.
Nljdpfx Agox Npzcjpjk
A buffer section after the second drying tunnel with a capacity of about 25 traverses serves as a transfer area to the unloading station.
Iklan ini diterjemahkan secara automatik. Mungkin terdapat kesilapan terjemahan.
The objective is to find a suitable subsequent user who will professionally dismantle and remove the complete system on their own responsibility at the beginning of the coming year.
System Concept Description
Loading and unloading of traverses with window frames and sashes takes place via a lifting/lowering station, which allows for ergonomic and process-safe feeding of the system.
Impregnation and priming of the workpieces is carried out in a vertical flooding booth. The coating application is performed using the flooding process via vertically arranged coating nozzles. This is followed by a drip-off and drying zone, where the traverses are guided in an inclined position.
The first drying tunnel has a buffer capacity of approx. 40 traverses. Drying is achieved by means of warm air generated from a hot water system with a supply temperature of approx. 85°C.
A switching unit enables workpieces to be routed either to a second impregnation/priming stage or directly to the subsequent coating section, as required.
The coating section consists of a lifting stand with integrated electrostatic application (E-Statik). Coating is performed on one side only, supplemented by an automated turning unit, allowing workpieces to be returned to the spray system for a repeat coating pass.
The second drying tunnel enables buffering of approx. 50 traverses. Here as well, drying is by warm air supplied by a hot water system at approx. 85°C.
Nljdpfx Agox Npzcjpjk
A buffer section after the second drying tunnel with a capacity of about 25 traverses serves as a transfer area to the unloading station.
Iklan ini diterjemahkan secara automatik. Mungkin terdapat kesilapan terjemahan.
Dokumen
Pembekal
Nota: Daftar secara percuma atau log masuk, untuk mengakses semua maklumat.
Hantar permintaan
Telefon & Faks
+43 664 3... iklan
Iklan anda telah berjaya dipadamkan
Berlaku ralat


























