Stesen pemasangan robot, stesen dosEpson
G10-854SR
Stesen pemasangan robot, stesen dos
Epson
G10-854SR
VB ditambah cukai perkhidmatan
€7,140
Keadaan
Terpakai
Lokasi
Borken 

Gambar menunjukkan
Tunjukkan peta
Data mesin
- Nama mesin:
- Stesen pemasangan robot, stesen dos
- Pengeluar:
- Epson
- Model:
- G10-854SR
- Keadaan:
- sangat baik (terpakai)
Harga & Lokasi
VB ditambah cukai perkhidmatan
€7,140
- Lokasi:
- Dunkerstrasse 29, 46325 Borken/Burlo, Deutschland

Hubungi
Butiran tawaran
- ID iklan:
- A7393211
- Nombor rujukan:
- 25070
- Kemas kini:
- terakhir pada 16.02.2026
Penerangan
Epson G10-854SR Robot Assembly Station and Dispensing Station
The assembly station is divided into the following sub-stations: 3.1 Dispensing Area, 3.2 KK+SW Assembly Area, and 3.3 Front Assembly Area. (KK = Heat Sink, SW = End Wall Bracket)
St. 3.1: Dispensing Area:
- A workpiece carrier (WT) with mounted chassis and PCBs enters the dispensing area via the transfer belt.
- It is stopped at the lifting-positioning unit (HuPo), lifted off the belt, and fixed in place.
- The X-Y-Z handling moves the dispensing head to the designated position and starts the dispensing process.
- After successful dispensing, the handling moves to the rest position, and the WT is placed back on the belt.
- Continued transfer to the KK+SW assembly area (provided there is no WT in the mounting position).
St. 3.2: KK+SW Assembly Area:
- A WT from the dispensing area arrives in the KK+SW assembly area via the transfer belt.
- It is stopped at the lifting-positioning unit (HuPo), lifted off the belt, and fixed in place. The chassis side walls of the partially assembled unit are aligned.
- KK tray and SW tray positioning occurs simultaneously.
- A stack of 12 KK trays and a stack of 12 SW trays are manually placed on their respective infeed conveyors outside the safety enclosure.
- The two safety shutters are opened, and the loaded tray stacks move into the gripper position of the respective stacker.
- The safety shutters are closed again.
- The respective grippers pick up the corresponding tray.
- The tray is separated using the Z-axis and transported upward (above the normal pick-up height).
- For centering and stabilization, a centering support is positioned beneath each tray using X-axis handling.
- With the stacker's Z-axis, the respective tray is placed on the centering support.
- The trays are ready for component pick-up.
- With the multi-gripper on the SCARA robot, the KK is picked up from the tray and placed in an intermediate position as an alignment aid (to achieve exact pick-up positions for assembly).
- The KK is scanned, picked up again, and if the scanner result is OK, mounted onto the WT.
- Any KK that is not OK is placed in a reject box.
- The multi-gripper on the SCARA robot then picks up the SW from the tray and places it in the alignment position.
- The SW is picked up again and mounted onto the WT.
- Assembly continues in the front assembly area.
Technical Data:
Design: SCARA (4-axis robot)
Nominal Load Capacity: 5 kg, Maximum: 10 kg
Horizontal Reach: 850 mm
Vertical Reach: Axis 3: 420 mm
Orientation Range: J4: +/- 360°
Repeatability (Horizontal): +/- 0.025 mm
Repeatability (Vertical, J3): +/- 0.01 mm
Repeatability (Orientation, J4): +/- 0.005°
Maximum Working Range: Axis 1: +/- 152°, Axis 2: +/- 152.5°, Axis 3: 420 mm, Axis 4: +/- 360°
Maximum Operating Speed: J1, J2: +/- 11,000 mm/s, J3: +/- 2,350 mm/s, J4: +/- 2,400°/s
Permissible Inertia: nominal 0.02 kg*m², maximum 0.25 kg*m²
User Wiring (electrical): 1x D-Sub 9 pin, 1x D-Sub 15 pin
Z-Axis: Outer diameter: 25 mm
Press-in Force: 250 N
Weight: 48 kg
Controller: EPSON RC180
Mounting Type: Ceiling
IP Protection Class: IP20
Power and Signal Cables: 3m
Pedpfjibx S Nox Af Ejgi
Financing through our bank is also possible.
komplett-konzept.leasingo.de
Iklan ini diterjemahkan secara automatik. Mungkin terdapat kesilapan terjemahan.
The assembly station is divided into the following sub-stations: 3.1 Dispensing Area, 3.2 KK+SW Assembly Area, and 3.3 Front Assembly Area. (KK = Heat Sink, SW = End Wall Bracket)
St. 3.1: Dispensing Area:
- A workpiece carrier (WT) with mounted chassis and PCBs enters the dispensing area via the transfer belt.
- It is stopped at the lifting-positioning unit (HuPo), lifted off the belt, and fixed in place.
- The X-Y-Z handling moves the dispensing head to the designated position and starts the dispensing process.
- After successful dispensing, the handling moves to the rest position, and the WT is placed back on the belt.
- Continued transfer to the KK+SW assembly area (provided there is no WT in the mounting position).
St. 3.2: KK+SW Assembly Area:
- A WT from the dispensing area arrives in the KK+SW assembly area via the transfer belt.
- It is stopped at the lifting-positioning unit (HuPo), lifted off the belt, and fixed in place. The chassis side walls of the partially assembled unit are aligned.
- KK tray and SW tray positioning occurs simultaneously.
- A stack of 12 KK trays and a stack of 12 SW trays are manually placed on their respective infeed conveyors outside the safety enclosure.
- The two safety shutters are opened, and the loaded tray stacks move into the gripper position of the respective stacker.
- The safety shutters are closed again.
- The respective grippers pick up the corresponding tray.
- The tray is separated using the Z-axis and transported upward (above the normal pick-up height).
- For centering and stabilization, a centering support is positioned beneath each tray using X-axis handling.
- With the stacker's Z-axis, the respective tray is placed on the centering support.
- The trays are ready for component pick-up.
- With the multi-gripper on the SCARA robot, the KK is picked up from the tray and placed in an intermediate position as an alignment aid (to achieve exact pick-up positions for assembly).
- The KK is scanned, picked up again, and if the scanner result is OK, mounted onto the WT.
- Any KK that is not OK is placed in a reject box.
- The multi-gripper on the SCARA robot then picks up the SW from the tray and places it in the alignment position.
- The SW is picked up again and mounted onto the WT.
- Assembly continues in the front assembly area.
Technical Data:
Design: SCARA (4-axis robot)
Nominal Load Capacity: 5 kg, Maximum: 10 kg
Horizontal Reach: 850 mm
Vertical Reach: Axis 3: 420 mm
Orientation Range: J4: +/- 360°
Repeatability (Horizontal): +/- 0.025 mm
Repeatability (Vertical, J3): +/- 0.01 mm
Repeatability (Orientation, J4): +/- 0.005°
Maximum Working Range: Axis 1: +/- 152°, Axis 2: +/- 152.5°, Axis 3: 420 mm, Axis 4: +/- 360°
Maximum Operating Speed: J1, J2: +/- 11,000 mm/s, J3: +/- 2,350 mm/s, J4: +/- 2,400°/s
Permissible Inertia: nominal 0.02 kg*m², maximum 0.25 kg*m²
User Wiring (electrical): 1x D-Sub 9 pin, 1x D-Sub 15 pin
Z-Axis: Outer diameter: 25 mm
Press-in Force: 250 N
Weight: 48 kg
Controller: EPSON RC180
Mounting Type: Ceiling
IP Protection Class: IP20
Power and Signal Cables: 3m
Pedpfjibx S Nox Af Ejgi
Financing through our bank is also possible.
komplett-konzept.leasingo.de
Iklan ini diterjemahkan secara automatik. Mungkin terdapat kesilapan terjemahan.
Pembekal
Nota: Daftar secara percuma atau log masuk, untuk mengakses semua maklumat.
Didaftarkan sejak: 2008
589 Iklan dalam talian
Hantar permintaan
Telefon & Faks
+49 2862 ... iklan
Iklan-iklan ini juga mungkin menarik minat anda.
Iklan kecil
Kirkel
10,007 km
Robot industri
EpsonSCARA G10-854SR
EpsonSCARA G10-854SR
Iklan kecil
Altena
9,953 km
Kain penapis untuk press penapis ruang
Filtertücher für FilterpressenKurzfristig verfügbar
Filtertücher für FilterpressenKurzfristig verfügbar
Iklan kecil
Berlin
9,555 km
Robot industri
KukaKR 90
KukaKR 90
Iklan kecil
Dinkelscherben
9,770 km
Pengacuan suntikan tali pinggang penghantar L tali pinggang penghantar
die magnetprofis2022120610
die magnetprofis2022120610
Iklan kecil
Dingolfing
9,629 km
Keselamatan pengisaran garis
DEMAGDKK 5 10 AL
DEMAGDKK 5 10 AL
Iklan kecil
Gers
10,616 km
Mesin memotong laser gentian
Bodor P3 20KW
Bodor P3 20KW
Iklan kecil
Coevorden
9,999 km
Mesin pemotong laser dengan 2 palet 6 Kw
AOREPH3015 STOCK ( 6 KW )
AOREPH3015 STOCK ( 6 KW )
Iklan kecil
Neumarkt in der Oberpfalz
9,701 km
Pembakar minyak
Riello RL50 Ölbrenner ca.15kg/hRiello RL50
Riello RL50 Ölbrenner ca.15kg/hRiello RL50
Iklan kecil
Deining
9,695 km
Pembakar gas
WEISHAUPT WM-G10/4-A -1100kw,WM-G10/3A -1000kw, WM-G10/3A-900kw
WEISHAUPT WM-G10/4-A -1100kw,WM-G10/3A -1000kw, WM-G10/3A-900kw
Iklan kecil
Jerman
9,760 km
Mesin pemotong laser yang dilindungi sepenuhnya
BodorP Series 22KW
BodorP Series 22KW
Iklan anda telah berjaya dipadamkan
Berlaku ralat