Stesen pemasangan robot, stesen dosEpson
G10-854SR
Stesen pemasangan robot, stesen dos
Epson
G10-854SR
VB ditambah cukai perkhidmatan
€7,140
Keadaan
Terpakai
Lokasi
Borken 

Gambar menunjukkan
Tunjukkan peta
Data mesin
- Nama mesin:
- Stesen pemasangan robot, stesen dos
- Pengeluar:
- Epson
- Model:
- G10-854SR
- Keadaan:
- sangat baik (terpakai)
Harga & Lokasi
VB ditambah cukai perkhidmatan
€7,140
- Lokasi:
- Dunkerstrasse 29, 46325 Borken/Burlo, Deutschland

Hubungi
Butiran tawaran
- ID iklan:
- A7393211
- Nombor rujukan:
- 25070
- Kemas kini:
- terakhir pada 07.08.2025
Penerangan
Epson G10-854SR Robot Assembly Station Dispensing Station
The assembly station is divided into the following sub-stations: 3.1 Dispensing Area, 3.2 Assembly Area KK+SW, and 3.3 Assembly Area Front. (KK = heatsink, SW = front wall bracket)
St.3.1: Dispensing Area
- A workpiece carrier (WT) with mounted chassis and circuit boards is conveyed via the transfer belt into the dispensing area.
- The WT is stopped at the lift-positioning unit (HuPo), raised off the belt, and secured in place
- The X-Y-Z handling system moves the dispensing head to the designated position and initiates the dispensing process.
- Once dosing is completed successfully, the handling system moves to the home position and the WT is placed back onto the conveyor
- Transfer continues into the assembly area KK+SW (prerequisite: no WT in placement position)
St.3.2: Assembly Area KK+SW
- A WT transported from the dispensing area enters the KK+SW assembly area via the transfer belt.
- It is stopped at the lift-positioning unit (HuPo), raised from the conveyor, and fixed in place; during this, the chassis side panels of the partially assembled component are aligned
- Simultaneously, the positioning of the KK and SW tray is carried out
- Both a KK tray stack (12) and a SW tray stack (12) are manually placed onto each respective infeed conveyor outside of the safety enclosure
- The two safety shutters are opened and the loaded tray stacks are conveyed into the gripping position of their respective stackers
- The safety shutters are then closed
- The respective grippers pick up the corresponding tray
- Using the Z-axis, trays are singled and transported upwards (above the actual pick-up height)
- To center and stabilize the trays, a centering support is positioned beneath each tray using the X-handling system.
- Using the stacker Z-axis, each tray is placed onto its centering support
- The trays are now ready for component pick-up
- The SCARA robot with a multi-gripper picks up the KK from the tray and places it in an intermediate alignment position (to compensate for inaccuracies in the pick-up and establish a fixed gripping point for assembly)
- The KK is scanned, picked up again, and if the scanner result is OK, installed onto the WT
- Non-OK KKs are placed in a non-OK container
- The multi-gripper on the SCARA robot then picks up the SW from the tray and places it in the alignment position
- The SW is picked up again and installed onto the WT
- Continue with Assembly Area Front
Technical Data
Design: SCARA (4-axis robot)
Payload: nominal 5 kg, maximum 10 kg
Horizontal reach: 850 mm
Vertical reach: Axis 3: 420 mm
Rotational range: J4: +/- 360°
Lsdpfx Agoibx S Njpehr
Horizontal repeatability: +/- 0.025 mm
Vertical repeatability: J3: +/- 0.01 mm
Rotational repeatability: J4: +/- 0.005°
Maximum work envelope: Axis 1: +/- 152°, Axis 2: +/- 152.5°, Axis 3: 420 mm, Axis 4: +/- 360°
Maximum operating speed: J1,J2: +/- 11,000 mm/s, J3: +/- 2,350 mm/s, J4: +/- 2,400°/s
Permissible inertia: nominal 0.02 kg*m², maximum 0.25 kg*m²
User cabling, electrical: 1x D-Sub 9 pin, 1x D-Sub 15 pin
Z-axis: Outer diameter: 25 mm
Press-in force: 250 N
Weight: 48 kg
Control: EPSON RC180
Mounting type: Ceiling
IP protection class: IP20
Power and signal cables: 3 m
Additional assembly modules in other sizes – new and used – can be found in our shop!
International shipping costs on request.
Iklan ini diterjemahkan secara automatik. Mungkin terdapat kesilapan terjemahan.
The assembly station is divided into the following sub-stations: 3.1 Dispensing Area, 3.2 Assembly Area KK+SW, and 3.3 Assembly Area Front. (KK = heatsink, SW = front wall bracket)
St.3.1: Dispensing Area
- A workpiece carrier (WT) with mounted chassis and circuit boards is conveyed via the transfer belt into the dispensing area.
- The WT is stopped at the lift-positioning unit (HuPo), raised off the belt, and secured in place
- The X-Y-Z handling system moves the dispensing head to the designated position and initiates the dispensing process.
- Once dosing is completed successfully, the handling system moves to the home position and the WT is placed back onto the conveyor
- Transfer continues into the assembly area KK+SW (prerequisite: no WT in placement position)
St.3.2: Assembly Area KK+SW
- A WT transported from the dispensing area enters the KK+SW assembly area via the transfer belt.
- It is stopped at the lift-positioning unit (HuPo), raised from the conveyor, and fixed in place; during this, the chassis side panels of the partially assembled component are aligned
- Simultaneously, the positioning of the KK and SW tray is carried out
- Both a KK tray stack (12) and a SW tray stack (12) are manually placed onto each respective infeed conveyor outside of the safety enclosure
- The two safety shutters are opened and the loaded tray stacks are conveyed into the gripping position of their respective stackers
- The safety shutters are then closed
- The respective grippers pick up the corresponding tray
- Using the Z-axis, trays are singled and transported upwards (above the actual pick-up height)
- To center and stabilize the trays, a centering support is positioned beneath each tray using the X-handling system.
- Using the stacker Z-axis, each tray is placed onto its centering support
- The trays are now ready for component pick-up
- The SCARA robot with a multi-gripper picks up the KK from the tray and places it in an intermediate alignment position (to compensate for inaccuracies in the pick-up and establish a fixed gripping point for assembly)
- The KK is scanned, picked up again, and if the scanner result is OK, installed onto the WT
- Non-OK KKs are placed in a non-OK container
- The multi-gripper on the SCARA robot then picks up the SW from the tray and places it in the alignment position
- The SW is picked up again and installed onto the WT
- Continue with Assembly Area Front
Technical Data
Design: SCARA (4-axis robot)
Payload: nominal 5 kg, maximum 10 kg
Horizontal reach: 850 mm
Vertical reach: Axis 3: 420 mm
Rotational range: J4: +/- 360°
Lsdpfx Agoibx S Njpehr
Horizontal repeatability: +/- 0.025 mm
Vertical repeatability: J3: +/- 0.01 mm
Rotational repeatability: J4: +/- 0.005°
Maximum work envelope: Axis 1: +/- 152°, Axis 2: +/- 152.5°, Axis 3: 420 mm, Axis 4: +/- 360°
Maximum operating speed: J1,J2: +/- 11,000 mm/s, J3: +/- 2,350 mm/s, J4: +/- 2,400°/s
Permissible inertia: nominal 0.02 kg*m², maximum 0.25 kg*m²
User cabling, electrical: 1x D-Sub 9 pin, 1x D-Sub 15 pin
Z-axis: Outer diameter: 25 mm
Press-in force: 250 N
Weight: 48 kg
Control: EPSON RC180
Mounting type: Ceiling
IP protection class: IP20
Power and signal cables: 3 m
Additional assembly modules in other sizes – new and used – can be found in our shop!
International shipping costs on request.
Iklan ini diterjemahkan secara automatik. Mungkin terdapat kesilapan terjemahan.
Pembekal
Nota: Daftar secara percuma atau log masuk, untuk mengakses semua maklumat.
Didaftarkan sejak: 2008
Hantar permintaan
Telefon & Faks
+49 2862 ... iklan
Iklan-iklan ini juga mungkin menarik minat anda.
Iklan kecil
Saerbeck
9,943 km
Laser gentian
DurmaHD-F(L) 3015 lll 15 kW
DurmaHD-F(L) 3015 lll 15 kW
Iklan kecil
Wettringen
9,965 km
Mesin pemisah gergaji
Uniforest43/20 J
Uniforest43/20 J
Iklan kecil
Kürten
9,983 km
Sistem robot untuk mengisar
Weiz Industrie- & Robotertechnik GmbHRSA-KR30
Weiz Industrie- & Robotertechnik GmbHRSA-KR30
Iklan kecil
Altena
9,953 km
Kain penapis untuk press penapis ruang
Filtertücher für FilterpressenKurzfristig verfügbar
Filtertücher für FilterpressenKurzfristig verfügbar
Iklan kecil
Ennepetal
9,976 km
Sel kimpalan lengkap dengan robot kimpalan
KUKA + Dalex + HSKR 150 R2700 extra +
KUKA + Dalex + HSKR 150 R2700 extra +
Iklan kecil
Burgas
8,441 km
Robot Perindustrian
KUKAKR200-3 COMP + SPINDLE +TOOL CHANGER SET
KUKAKR200-3 COMP + SPINDLE +TOOL CHANGER SET
Iklan kecil
Berlin
9,555 km
Robot industri
KukaKR 90
KukaKR 90
Iklan kecil
Dinkelscherben
9,770 km
Pengacuan suntikan tali pinggang penghantar L tali pinggang penghantar
die magnetprofis2022120610
die magnetprofis2022120610
Iklan kecil
Gers
10,616 km
Mesin memotong laser gentian
Bodor P3 20KW
Bodor P3 20KW
Iklan kecil
Coevorden
9,999 km
Mesin pemotong laser dengan 2 palet 6 Kw
OREEOR-PH 3015 STOCK ( 6 KW )
OREEOR-PH 3015 STOCK ( 6 KW )
Iklan anda telah berjaya dipadamkan
Berlaku ralat










































































