Loji CHP Capstone C1000 + APROVIS
Capstone C1000

Tahun pembuatan
2015
Keadaan
Terpakai
Lokasi
Laško Slovenia
Loji CHP Capstone C1000 + APROVIS Capstone C1000
Loji CHP Capstone C1000 + APROVIS Capstone C1000
Loji CHP Capstone C1000 + APROVIS Capstone C1000
Loji CHP Capstone C1000 + APROVIS Capstone C1000
Loji CHP Capstone C1000 + APROVIS Capstone C1000
Loji CHP Capstone C1000 + APROVIS Capstone C1000
Loji CHP Capstone C1000 + APROVIS Capstone C1000
Loji CHP Capstone C1000 + APROVIS Capstone C1000
more Images
Capstone C1000
Capstone C1000
Capstone C1000
Capstone C1000
Capstone C1000
Capstone C1000
Capstone C1000
Capstone C1000

Data asas

Nama mesin:
Loji CHP Capstone C1000 + APROVIS
Pengeluar:
Capstone
Model:
C1000
Tahun pembuatan:
2015
Keadaan:
terpakai
Jam operasi:
50,000 h

Harga & Lokasi

Lokasi:
Laško, Slovenia Slovenia
Hubungi

Butiran teknikal

Enjin dan kotak gear

Bahan api:
gas domestik H

Butiran kuasa

Voltan masuk:
400 V
Frekuensi masukan:
50 Hz
Arus masuk:
1,444 A
Jenis arus masuk:
tiga fasa

Dokumentasi dan pensijilan

Dokumentasi / manual

Penyejukan

Jenis penyejukan:
udara

Maklumat lanjut

Kuasa nominal (sebenar):
999 kVA
Kelajuan putaran (maks.):
60,000 rpm

Butiran tawaran

ID iklan:
A22903560
Nombor rujukan:
SPTE-C1000
Kemas kini:
terakhir pada 08.10.2026

Penerangan

Used natural gas-fired combined heat and power plant for electricity and industrial steam production.
Main equipment:
• Capstone C1000: five C200 microturbine modules, each rated at 200 kW; electrical output of the complete package: 999 kWe; 400 V / 50 Hz; grid-parallel operation; common acoustic enclosure and control system.
• APROVIS waste heat steam boiler: rated production of 2,000 kg/h of saturated steam at 6 bar(g); maximum allowable pressure 9 bar(g); equipped with two economizer stages for heat recovery.
Fjdpfxjz I T Eks Anwsgh
• Reinhard Simon CKO501G supplementary duct burner: 500 kW, for additional exhaust gas heating upstream of the boiler.
• BIO-KOMP fuel gas booster compressor: 30 kW, maximum flow 340 Nm³/h, discharge pressure 6 bar(g).

The plant has been regularly maintained under a maintenance contract, with components replaced in accordance with the maintenance schedule. One of the five turbine modules is currently non-operational.
Operating hours: T1: 53,191 h; T2: 50,891 h; T3: 51,628 h; T4: 52,691 h; T5: 49,487 h.
The pressure equipment has an inspection certificate issued by an accredited pressure equipment inspection body. Technical documentation is available. Inspection, price and collection terms are subject to agreement.

Iklan ini diterjemahkan secara automatik. Mungkin terdapat kesilapan terjemahan.

Pembekal

Kali terakhir dalam talian: minggu lepas

Didaftarkan sejak: 2025

2 Iklan dalam talian

Hubungi

Hantar permintaan

Tanahus 
Jerman
Austria
Switzerland
Amerika Syarikat
United Kingdom
Perancis
Belgium
Sepanyol
Meksiko
Itali
Belanda
Poland
Persekutuan Rusia
Belarus (Republik Belarus)
Ukraina
Estonia
Turki
New Zealand
Ireland
Republik Czech
Denmark
Finland
Sweden
Norweg
Luksemburg
Yunani
Lithuania
Latvia
Iceland
Portugal
Brazil
Venezuela
Argentina
Hungary
Slovakia
Romania
Moldova
Slovenia
Serbia
Montenegro
Albania
Kroasia
Bulgaria
Makedonia Utara
Bosnia dan Herzegovina
Israel
Mesir
Maghribi
India
Indonesia
Korea Selatan
Jepun
Thailand
Malaysia
Vietnam
China, Republik Rakyat
Taiwan
Iran
Bangladesh
Nota: Permintaan anda akan dihantar kepada semua penjual dalam kategori mesin. Dengan cara ini, anda boleh menerima banyak tawaran.
Permintaan tidak dapat dihantar. Sila cuba lagi kemudian.

Telefon & Faks

+386 51 2... iklan