Loji CHP Capstone C1000 + APROVISCapstone
C1000
Loji CHP Capstone C1000 + APROVIS
Capstone
C1000
Tahun pembuatan
2015
Keadaan
Terpakai
Lokasi
Laško 

Data asas
- Nama mesin:
- Loji CHP Capstone C1000 + APROVIS
- Pengeluar:
- Capstone
- Model:
- C1000
- Tahun pembuatan:
- 2015
- Keadaan:
- terpakai
- Jam operasi:
- 50,000 h
Harga & Lokasi
- Lokasi:
- Laško, Slovenia

Hubungi
Butiran teknikal
Enjin dan kotak gear
Bahan api:
gas domestik H
Butiran kuasa
Voltan masuk:
400 V
Frekuensi masukan:
50 Hz
Arus masuk:
1,444 A
Jenis arus masuk:
tiga fasa
Dokumentasi dan pensijilan
Dokumentasi / manual
Penyejukan
Jenis penyejukan:
udara
Maklumat lanjut
Kuasa nominal (sebenar):
999 kVA
Kelajuan putaran (maks.):
60,000 rpm
Butiran tawaran
- ID iklan:
- A22903560
- Nombor rujukan:
- SPTE-C1000
- Kemas kini:
- terakhir pada 08.10.2026
Penerangan
Used natural gas-fired combined heat and power plant for electricity and industrial steam production.
Main equipment:
• Capstone C1000: five C200 microturbine modules, each rated at 200 kW; electrical output of the complete package: 999 kWe; 400 V / 50 Hz; grid-parallel operation; common acoustic enclosure and control system.
• APROVIS waste heat steam boiler: rated production of 2,000 kg/h of saturated steam at 6 bar(g); maximum allowable pressure 9 bar(g); equipped with two economizer stages for heat recovery.
Fjdpfxjz I T Eks Anwsgh
• Reinhard Simon CKO501G supplementary duct burner: 500 kW, for additional exhaust gas heating upstream of the boiler.
• BIO-KOMP fuel gas booster compressor: 30 kW, maximum flow 340 Nm³/h, discharge pressure 6 bar(g).
The plant has been regularly maintained under a maintenance contract, with components replaced in accordance with the maintenance schedule. One of the five turbine modules is currently non-operational.
Operating hours: T1: 53,191 h; T2: 50,891 h; T3: 51,628 h; T4: 52,691 h; T5: 49,487 h.
The pressure equipment has an inspection certificate issued by an accredited pressure equipment inspection body. Technical documentation is available. Inspection, price and collection terms are subject to agreement.
Iklan ini diterjemahkan secara automatik. Mungkin terdapat kesilapan terjemahan.
Main equipment:
• Capstone C1000: five C200 microturbine modules, each rated at 200 kW; electrical output of the complete package: 999 kWe; 400 V / 50 Hz; grid-parallel operation; common acoustic enclosure and control system.
• APROVIS waste heat steam boiler: rated production of 2,000 kg/h of saturated steam at 6 bar(g); maximum allowable pressure 9 bar(g); equipped with two economizer stages for heat recovery.
Fjdpfxjz I T Eks Anwsgh
• Reinhard Simon CKO501G supplementary duct burner: 500 kW, for additional exhaust gas heating upstream of the boiler.
• BIO-KOMP fuel gas booster compressor: 30 kW, maximum flow 340 Nm³/h, discharge pressure 6 bar(g).
The plant has been regularly maintained under a maintenance contract, with components replaced in accordance with the maintenance schedule. One of the five turbine modules is currently non-operational.
Operating hours: T1: 53,191 h; T2: 50,891 h; T3: 51,628 h; T4: 52,691 h; T5: 49,487 h.
The pressure equipment has an inspection certificate issued by an accredited pressure equipment inspection body. Technical documentation is available. Inspection, price and collection terms are subject to agreement.
Iklan ini diterjemahkan secara automatik. Mungkin terdapat kesilapan terjemahan.
Pembekal
Nota: Daftar secara percuma atau log masuk, untuk mengakses semua maklumat.
Kali terakhir dalam talian: minggu lepas
Didaftarkan sejak: 2025
2 Iklan dalam talian
Hantar permintaan
Telefon & Faks
+386 51 2... iklan
Iklan anda telah berjaya dipadamkan
Berlaku ralat