Turbin wap
1. Brněnská strojírna Turbogenerator set 25MW

EXW VB ditambah cukai perkhidmatan
€680,000
tahun pembuatan
1985
Keadaan
Terpakai
Lokasi
Republik Czech Republik Czech
Turbin wap 1. Brněnská strojírna Turbogenerator set 25MW
Turbin wap 1. Brněnská strojírna Turbogenerator set 25MW
Turbin wap 1. Brněnská strojírna Turbogenerator set 25MW
Turbin wap 1. Brněnská strojírna Turbogenerator set 25MW
Turbin wap 1. Brněnská strojírna Turbogenerator set 25MW
Turbin wap 1. Brněnská strojírna Turbogenerator set 25MW
Turbin wap 1. Brněnská strojírna Turbogenerator set 25MW
Turbin wap 1. Brněnská strojírna Turbogenerator set 25MW
Turbin wap 1. Brněnská strojírna Turbogenerator set 25MW
Turbin wap 1. Brněnská strojírna Turbogenerator set 25MW
Turbin wap 1. Brněnská strojírna Turbogenerator set 25MW
Turbin wap 1. Brněnská strojírna Turbogenerator set 25MW
Turbin wap 1. Brněnská strojírna Turbogenerator set 25MW
Turbin wap 1. Brněnská strojírna Turbogenerator set 25MW
Turbin wap 1. Brněnská strojírna Turbogenerator set 25MW
Turbin wap 1. Brněnská strojírna Turbogenerator set 25MW
Turbin wap 1. Brněnská strojírna Turbogenerator set 25MW
more Images
1. Brněnská strojírna Turbogenerator set 25MW
1. Brněnská strojírna Turbogenerator set 25MW
1. Brněnská strojírna Turbogenerator set 25MW
1. Brněnská strojírna Turbogenerator set 25MW
1. Brněnská strojírna Turbogenerator set 25MW
1. Brněnská strojírna Turbogenerator set 25MW
1. Brněnská strojírna Turbogenerator set 25MW
1. Brněnská strojírna Turbogenerator set 25MW
1. Brněnská strojírna Turbogenerator set 25MW
1. Brněnská strojírna Turbogenerator set 25MW
1. Brněnská strojírna Turbogenerator set 25MW
1. Brněnská strojírna Turbogenerator set 25MW
1. Brněnská strojírna Turbogenerator set 25MW
1. Brněnská strojírna Turbogenerator set 25MW
1. Brněnská strojírna Turbogenerator set 25MW
1. Brněnská strojírna Turbogenerator set 25MW
1. Brněnská strojírna Turbogenerator set 25MW
Gambar menunjukkan
Tunjukkan peta

Data mesin

Nama mesin:
Turbin wap
pengeluar:
1. Brněnská strojírna
Model:
Turbogenerator set 25MW
tahun pembuatan:
1985
Keadaan:
terpakai
fungsi:
berfungsi sepenuhnya

Harga & Lokasi

EXW VB ditambah cukai perkhidmatan
€680,000
Lokasi:
689/117, Vratimovská, 719 00 Slezská Ostrava Republik Czech
Hubungi

Butiran teknikal

Tekanan:
90 palang
Kuasa:
25 kW (33.99 kuasa kuda)
Frekuensi masukan:
50 Hz
Jenis arus masuk:
Penyaman udara
Suhu:
515 °C
Berat keseluruhan:
45,000 kg
Jumlah ketinggian:
5,000 mm
Kelajuan putaran (maks.):
3,000 rpm
Jenis penyejukan:
air

Butiran tawaran

ID iklan:
A19313346
Nombor rujukan:
TG1
kemas kini:
terakhir pada 06.06.2025

Penerangan

1. Brněnská strojírna, Turbogenerator set, back pressure steam turbine 25MW
Manufacturer: 1. Brněnská strojírna
Power: 25 000 kW
Type: R25-9/1,9
RPM: 3000 / min
Steam pressure: 90 bar
Output steam pressure: 18 bar
Steam temperature: 515 ºC

The equipment is from year 1985 and has received all maintenance required for the maximum reliability, availability and capacity.

Ibodewqp Acjpfx Abysc
Size: 3 000 x 3 000 x 5 100 mm
Weight: 45 000 kg

Generator, gearbox, oil system and all related electro and InC equipment included.
We will send all technical data on request.

Maintenece:
The machine has been regularly maintained and serviced since its commissioning. GO and SO have been carried out at intervals of about 5 years according to the actual condition. The O&M was carried out by the turbine manufacturer or a specialist company in the field.
The last O&M was carried out in 2007 for a total amount of 44.2 million EUR. The following repairs were carried out:
- repair of the rotor with new blading
- repair of the stator flow section with new blading
- Replacement of quick-action and control valve blocks
- replacement of the control gear on the machine,
- reconstruction of the control system
- repair of oil. system,
- revision of steam system, valves, drainage
The last repair (SO) was carried out in 2020 for a total amount of 16.2 million CZK. The following repairs were carried out:
- revision of the flow section of the turbine, cleaning, replacement of seals, rotor balancing
- oil revision and cleaning. Revision of the rotor, cleaning of the rotor, revision of the rotor system, installation of full flow filtration
- complete repair of the KUP with repiping,
- revision and repair of the turbine control and the control safety system
- inspection of steam pipelines and valves
Regular maintenance and servicing was carried out during operation, with further periodic repairs planned for 2027.

Pembekal

Didaftarkan sejak: 2025

22 Iklan dalam talian

Hubungi

Hantar permintaan

Tanahus 
Jerman
Austria
Switzerland
Amerika Syarikat
United Kingdom
Perancis
Belgium
Sepanyol
Meksiko
Itali
Belanda
Poland
Persekutuan Rusia
Belarus (Republik Belarus)
Ukraina
Estonia
Turki
New Zealand
Ireland
Republik Czech
Denmark
Finland
Sweden
Norweg
Luksemburg
Yunani
Lithuania
Latvia
Iceland
Portugal
Brazil
Venezuela
Argentina
Hungary
Slovakia
Romania
Moldova
Slovenia
Serbia
Montenegro
Albania
Kroasia
Bulgaria
Makedonia Utara
Bosnia dan Herzegovina
Israel
Mesir
Maghribi
India
Indonesia
Korea Selatan
Jepun
Thailand
Malaysia
Vietnam
China
Taiwan
Iran
Bangladesh
Afghanistan
Nota: Permintaan anda akan dihantar kepada semua penjual dalam kategori mesin. Dengan cara ini, anda boleh menerima banyak tawaran.
Permintaan tidak dapat dihantar. Sila cuba lagi kemudian.

Telefon & Faks

+420 370 ... iklan
Iklan-iklan ini juga mungkin menarik minat anda.
iklan kecil
Turbin wap 1. Brněnská strojírna Turbogenerator set 25MW
Turbin wap 1. Brněnská strojírna Turbogenerator set 25MW
Turbin wap 1. Brněnská strojírna Turbogenerator set 25MW
Turbin wap 1. Brněnská strojírna Turbogenerator set 25MW
Turbin wap 1. Brněnská strojírna Turbogenerator set 25MW
Turbin wap 1. Brněnská strojírna Turbogenerator set 25MW
Turbin wap 1. Brněnská strojírna Turbogenerator set 25MW
Turbin wap 1. Brněnská strojírna Turbogenerator set 25MW
Turbin wap 1. Brněnská strojírna Turbogenerator set 25MW
Turbin wap 1. Brněnská strojírna Turbogenerator set 25MW
Turbin wap 1. Brněnská strojírna Turbogenerator set 25MW
Turbin wap 1. Brněnská strojírna Turbogenerator set 25MW
more images
Republik Czech Republik Czech
9,206 km
Turbin wap
1. Brněnská strojírnaTurbogenerator set 25MW
Hubungi
iklan kecil
Turbin wap 1. Brněnská strojírna Turbogenerator set 25MW
Turbin wap 1. Brněnská strojírna Turbogenerator set 25MW
Turbin wap 1. Brněnská strojírna Turbogenerator set 25MW
Turbin wap 1. Brněnská strojírna Turbogenerator set 25MW
Turbin wap 1. Brněnská strojírna Turbogenerator set 25MW
Turbin wap 1. Brněnská strojírna Turbogenerator set 25MW
Turbin wap 1. Brněnská strojírna Turbogenerator set 25MW
Turbin wap 1. Brněnská strojírna Turbogenerator set 25MW
Turbin wap 1. Brněnská strojírna Turbogenerator set 25MW
Turbin wap 1. Brněnská strojírna Turbogenerator set 25MW
Turbin wap 1. Brněnská strojírna Turbogenerator set 25MW
Turbin wap 1. Brněnská strojírna Turbogenerator set 25MW
Turbin wap 1. Brněnská strojírna Turbogenerator set 25MW
more images
Republik Czech Republik Czech
9,206 km
Turbin wap
1. Brněnská strojírnaTurbogenerator set 25MW
Hubungi