Turbin wapŠkoda Plzeň
Turbogenerator set 25MW
Turbin wap
Škoda Plzeň
Turbogenerator set 25MW
EXW VB ditambah cukai perkhidmatan
€1,700,000
tahun pembuatan
1995
Keadaan
Terpakai
Lokasi
Republik Czech 

Gambar menunjukkan
Tunjukkan peta
Data mesin
- Nama mesin:
- Turbin wap
- pengeluar:
- Škoda Plzeň
- Model:
- Turbogenerator set 25MW
- tahun pembuatan:
- 1995
- Keadaan:
- terpakai
- fungsi:
- berfungsi sepenuhnya
- Jam operasi:
- 201,000 h
Harga & Lokasi
EXW VB ditambah cukai perkhidmatan
€1,700,000
- Lokasi:
- 117, Vratimovská 689, 719 00 Slezská Ostrava, Czechia
Hubungi
Butiran teknikal
- Tekanan:
- 19 palang
- Kuasa:
- 25,000 kW (33,990.50 kuasa kuda)
- Frekuensi masukan:
- 50 Hz
- Suhu:
- 320 °C
- Berat keseluruhan:
- 93,000 kg
- Kelajuan putaran (maks.):
- 3,000 rpm
- Jumlah panjang:
- 6,200 mm
- Jenis penyejukan:
- air
Butiran tawaran
- ID iklan:
- A19313656
- Nombor rujukan:
- TG3
- kemas kini:
- terakhir pada 06.06.2025
Penerangan
Škoda Plzeň, Turbogenerator set, condensate steam turbine 25 MW
Manufacturer: Škoda Plzeň
Power: 25 000 kW
Type:
RPM: 3000/ min
Steam pressure: 19 bar
Steam temperature: 320 ºC
Number of Extractions:1+3
Operation hours: 201000
Hodpfxjwqp U Eo Af Eofn
The equipment is from year 1995 and has received all maintenance required for the maximum reliability, availability and capacity.
Size: 4 700 x 6 200 mm,
Weight: 93 000
Generator, gearbox, condenser, condenser pumps, oil system and all related electro and InC equipment included.
We will send all technical data on request.
The machine has been regularly maintained and serviced since its commissioning. GO and SO have been carried out at intervals of about 5 years according to the actual condition. GO was carried out by the turbine manufacturer. The last GO was carried out in 2017 for a total amount of 112.6 million CZK. The following repairs were carried out:
- replacement of the old rotor with a new one,
- repair of the flow section of the stator and the distributor wheels and supports,
- replacement of the gearbox,
- repair of the regulation, oil. Repair of the system, condensation,
- installation of irrigation and new NZ,
Maintenance and servicing was carried out in the years after the GO, the inspection for subsequent repair was planned for 2024 and did not take place.
Manufacturer: Škoda Plzeň
Power: 25 000 kW
Type:
RPM: 3000/ min
Steam pressure: 19 bar
Steam temperature: 320 ºC
Number of Extractions:1+3
Operation hours: 201000
Hodpfxjwqp U Eo Af Eofn
The equipment is from year 1995 and has received all maintenance required for the maximum reliability, availability and capacity.
Size: 4 700 x 6 200 mm,
Weight: 93 000
Generator, gearbox, condenser, condenser pumps, oil system and all related electro and InC equipment included.
We will send all technical data on request.
The machine has been regularly maintained and serviced since its commissioning. GO and SO have been carried out at intervals of about 5 years according to the actual condition. GO was carried out by the turbine manufacturer. The last GO was carried out in 2017 for a total amount of 112.6 million CZK. The following repairs were carried out:
- replacement of the old rotor with a new one,
- repair of the flow section of the stator and the distributor wheels and supports,
- replacement of the gearbox,
- repair of the regulation, oil. Repair of the system, condensation,
- installation of irrigation and new NZ,
Maintenance and servicing was carried out in the years after the GO, the inspection for subsequent repair was planned for 2024 and did not take place.
Pembekal
Nota: Daftar secara percuma atau log masuk, untuk mengakses semua maklumat.
Didaftarkan sejak: 2025
Hantar permintaan
Telefon & Faks
+420 370 ... iklan
Iklan-iklan ini juga mungkin menarik minat anda.
iklan kecil

9,206 km
Turbin wap
Škoda PlzeňTurbogenerator set 25MW
Škoda PlzeňTurbogenerator set 25MW
Iklan anda telah berjaya dipadamkan
Berlaku ralat