Turbin wap
ČKD Turbogenerator set 17,5MW

EXW VB ditambah cukai perkhidmatan
€220,000
tahun pembuatan
1958
Keadaan
Terpakai
Lokasi
Republik Czech Republik Czech
Turbin wap ČKD Turbogenerator set 17,5MW
Turbin wap ČKD Turbogenerator set 17,5MW
Turbin wap ČKD Turbogenerator set 17,5MW
Turbin wap ČKD Turbogenerator set 17,5MW
Turbin wap ČKD Turbogenerator set 17,5MW
Turbin wap ČKD Turbogenerator set 17,5MW
Turbin wap ČKD Turbogenerator set 17,5MW
Turbin wap ČKD Turbogenerator set 17,5MW
Turbin wap ČKD Turbogenerator set 17,5MW
Turbin wap ČKD Turbogenerator set 17,5MW
Turbin wap ČKD Turbogenerator set 17,5MW
more Images
ČKD Turbogenerator set 17,5MW
ČKD Turbogenerator set 17,5MW
ČKD Turbogenerator set 17,5MW
ČKD Turbogenerator set 17,5MW
ČKD Turbogenerator set 17,5MW
ČKD Turbogenerator set 17,5MW
ČKD Turbogenerator set 17,5MW
ČKD Turbogenerator set 17,5MW
ČKD Turbogenerator set 17,5MW
ČKD Turbogenerator set 17,5MW
ČKD Turbogenerator set 17,5MW
Gambar menunjukkan
Tunjukkan peta

Data mesin

Nama mesin:
Turbin wap
pengeluar:
ČKD
Model:
Turbogenerator set 17,5MW
tahun pembuatan:
1958
Keadaan:
terpakai
fungsi:
berfungsi sepenuhnya

Harga & Lokasi

EXW VB ditambah cukai perkhidmatan
€220,000
Lokasi:
117, Vratimovská 689, 719 00 Slezská Ostrava, Czechia Republik Czech
Hubungi

Butiran teknikal

Kuasa:
17,500 kW (23,793.35 kuasa kuda)
Frekuensi masukan:
50 Hz
Suhu:
320 °C
Berat keseluruhan:
30,000 kg
Kelajuan putaran (maks.):
3,000 rpm
Jumlah panjang:
7,000 mm

Butiran tawaran

ID iklan:
A19313691
Nombor rujukan:
TG4
kemas kini:
terakhir pada 06.06.2025

Penerangan

ČKD, Turbogenerator set, condensate steam turbine 17,5MW
Manufacturer: ČKD
Power: 17 500 kW
Type:
RPM: 3000/ min
Steam pressure: 19 bar
Output steam pressure: 18 bar
Steam temperature: 320 ºC

The equipment is from year 1958 and has received all maintenance required for the maximum reliability, availability and capacity.

Size: 3500 x 3500x7000mm,
Weight:

Generator, gearbox, oil system and all related electro and InC equipment included.
We will send all technical data on request.
The machine has been regularly maintained and serviced since its commissioning. The period of GO and SO was carried out according to the actual condition. The repairs were carried out by the turbine manufacturer, the reconstruction (1969) and subsequent repairs were carried out by the 1st Brno Engineering Works. GO with replacement of blades was carried out in 1986 and SO in 2005 with standard scope of work. In the last period, routine maintenance and repairs were carried out by the local maintenance of the heating plant, when the following repairs were mainly carried out:
- control maintenance, oil. system, condensation
- maintenance of the heat exchanger station
- maintenance of valves
Gusdpfx Ajwqqa Njf Eeh

Pembekal

Didaftarkan sejak: 2025

22 Iklan dalam talian

Hubungi

Hantar permintaan

Tanahus 
Jerman
Austria
Switzerland
Amerika Syarikat
United Kingdom
Perancis
Belgium
Sepanyol
Meksiko
Itali
Belanda
Poland
Persekutuan Rusia
Belarus (Republik Belarus)
Ukraina
Estonia
Turki
New Zealand
Ireland
Republik Czech
Denmark
Finland
Sweden
Norweg
Luksemburg
Yunani
Lithuania
Latvia
Iceland
Portugal
Brazil
Venezuela
Argentina
Hungary
Slovakia
Romania
Moldova
Slovenia
Serbia
Montenegro
Albania
Kroasia
Bulgaria
Makedonia Utara
Bosnia dan Herzegovina
Israel
Mesir
Maghribi
India
Indonesia
Korea Selatan
Jepun
Thailand
Malaysia
Vietnam
China
Taiwan
Iran
Bangladesh
Afghanistan
Nota: Permintaan anda akan dihantar kepada semua penjual dalam kategori mesin. Dengan cara ini, anda boleh menerima banyak tawaran.
Permintaan tidak dapat dihantar. Sila cuba lagi kemudian.

Telefon & Faks

+420 370 ... iklan